County News
A village on hold
Sterling Homes still looking for a way through
Paul Mondell won’t quit. He has revised his Wellington housing plans, offered to fund a fix for the County’s self-created waterworks problem, and kept pressing Shire Hall for a yes. He’s still pressing.
Mondell is a principal at Sterling Homes. He plans to build about 200 homes on either side of Cleminson Street (behind the Legion) in Wellington—a mix of singles and townhomes, though lately he has been contemplating adding some rental apartments to the developer’s Wellington offering.
Sterling has been working on its Wellington housing proposal since at least early 2022. Shire Hall is blocking the development, saying its wastewater plant has no room for more homes.
It’s not personal. Shire Hall gives the same answer to anyone seeking to build in the village. It struck a deal with a developer planning a major project north of the Millennium Trail, committing all remaining wastewater capacity for $12 million. Senior leadership won awards for the arrangement.
What was once hailed as innovative financing has become a shackle on Wellington. The developer shows no sign of building, yet holds tight to the capacity it paid for. Everyone else waits. No new homes. No new businesses. One developer bought the capacity. The whole village pays the price.
Adding insult to injury, waterworks customers across Prince Edward County have spent $50 million upgrading Wellington’s system for a wave of homebuilding that has yet to materialize.
Sterling Homes has proposed a workaround to move its project forward: a modular wastewater treatment plant like those used across Ontario and elsewhere. The builder arranged a tour of a facility in Quinte West, inviting councillors and Shire Hall staff to question the operator about how the system works and whether it could serve Wellington.
Councillors saw promise. Shire Hall saw added complexity in a system it would ultimately have to manage. So the idea drifted into space.
Still, Mondell and Sterling Homes keep pressing for approval. Their proposal is infill: homes where they are needed, within the existing community, on land designated for housing in Wellington’s Secondary Plan. It is where the next homes belong.
“It’s a huge problem,” said Mondell. “We would love to start producing housing in Wellington.”
Mondell isn’t promising homes tomorrow. Even with approval, he says they are likely a couple of years away. But every delay pushes them further off.
Wellington needs housing. Residents have paid for growth. Yet the village remains locked behind a deal that reserved its future for someone else.
So Wellington pays more and gets less: higher water bills, no new homes, and another year of waiting.
Something has to give.
Shouldn’t just be water works customers paying for the infrastructure so the Village can grow. Should be all taxpayers who in turn benefit from growth.
@chuck … said every developer, everywhere.
Feel free to list what you think are the benefits that accrue from growth, and how much you think those benefits are worth, exactly.
We have a rate-supported system for a reason. Rural residents on private wells and septic systems (like me) already pay 100% of their own water and wastewater capital and maintenance costs out-of-pocket (drilling wells, replacing septic beds, buying pumps and filtration).
For what it’s worth, I want no part of being connected to a sewer and water system whose cost is 100% outside of my control or influence. Fortunately, I am dozens of kilometers away from existing PEC systems.
Major water and wastewater expansions require millions of dollars in upfront borrowing before a single new house is built.
While Development Charges (DCs) are meant to recoup these costs from builders, under Ontario’s Bill 17 (Protect Ontario by Building Faster and Smarter Act, 2025), which took effect in November 2025, the province changed the rules so that residential Development Charges (DCs) are no longer paid upfront at building permit issuance, but are instead deferred until occupancy (either when the occupancy permit is issued or when the building is first occupied).
So, what the Province and developers would have the County up front, on 100% speculation, for expensive infrastructure upgrades.
Remember when developers used to build “spec homes”? They DON’T ANY MORE. Why? Because they do not want to assume the risk of having a house sit on the market. That was even before Ontario Bill 17.
There are, of course, those that will continue to parrot this false “growth pays for growth” narrative. To that, I say simply, “Follow the Money”.